Logistics
Shipping from China to Canada: what it actually costs and how long it actually takes
Current ocean rates with the date attached, the LCL break-even, which Canadian port to use, a worked landed cost to Ontario, and the three tax facts that change the budget — including the $150 threshold that does not apply to China.
The short version
- Transpacific is expensive right now. Drewry's World Container Index put Shanghai–Los Angeles at US$7,838 per forty-foot container on 24 September 2026, against a composite of $4,468. The composite badly understates what a Canadian importer pays.
- Rates move weekly. The same index composite was $2,712 in May 2026. Four months, up 65 per cent. Never budget from a figure you read in an article, including this one.
- The LCL break-even is around 13–15 cubic metres. Below that, consolidate. Above it, you are paying LCL prices for space you could have had free in your own box.
- Canada does not levy duty on ocean freight. Value for duty is built to the place of direct shipment, so on FOB terms the Pacific crossing is outside the dutiable value.
- The $40 and $150 courier thresholds do not apply to China. They are a CUSMA concession for US and Mexican goods. From China you get the general $20 de minimis and nothing more.
- Chinese New Year 2027 falls on 6 February — eleven days earlier than 2026. Anyone planning off last year's calendar will be eleven days late.
- Budget 11 to 14 weeks from purchase order to shelf, and know that fewer than six sailings in ten arrived on time in July 2026.
Every claim below links to the source it comes from. Where a figure is an estimate rather than a published number, this article says so.
Almost every article about shipping from China quotes a number, and almost every number is wrong by the time you read it. In May 2026 the World Container Index composite sat at US$2,712. On 24 September 2026 it was $4,468, and the Shanghai–Los Angeles lane specifically was $7,838 — up 132 per cent in four months.2 A budget built on a figure from a blog post is a budget built on sand.
So this article does two things. It gives you the current numbers, dated, with the index they came from — and more usefully, it gives you the structure: which costs are fixed, which scale, which are government charges you can look up, and which are commercial ranges that a forwarder can and will quote differently to two callers on the same day. The structure survives the rate cycle. The numbers do not.
Part one — what it costs
1. What ocean freight costs right now, and why the headline is misleading
- Reading date
- 24 September 2026
- Index
- Drewry World Container Index, per 40ft container
- Volatility
- The composite moved 65% in four months. Re-check before you budget.
| Lane | 10 Sep 2026 | 17 Sep 2026 | 24 Sep 2026 |
|---|---|---|---|
| WCI composite | US$4,476 | US$4,500 | US$4,468 |
| Shanghai → Los Angeles | $7,352 | $7,712 | $7,838 |
| Shanghai → New York | $9,726 | $10,394 | $10,373 |
| Shanghai → Rotterdam | $3,997 | $3,626 | $3,485 |
| Shanghai → Genoa | $4,216 | $4,016 | $3,835 |
Figures from Drewry's weekly World Container Index.23 The Freightos Baltic Index corroborates: China and East Asia to the North American West Coast read US$8,102, and to the East Coast US$9,606, when checked on 25 September 2026.45 Two independent indices within about three per cent of each other is as much confirmation as this market offers.
The composite lies to Canadian importers
Look at the table again. The composite is $4,468. The lane you actually ship on is $7,838. Most commentary quotes the composite because it is the headline number, and for a transpacific importer it understates the cost by roughly three quarters.
For context on where that sits historically: the 2019 pre-pandemic composite average was around $1,420 and the ten-year average around $2,809. The 2024 Red Sea spike peaked at $5,937 and the all-time pandemic peak was $10,377 in September 2021. So the composite today is roughly three times the 2019 normal and about a quarter below the 2024 peak — but the transpacific lane is running above that 2024 composite peak. Quote the lane, not the composite.
Why transpacific is rising while Asia–Europe falls
Carriers withdrew capacity ahead of China's National Day Golden Week: eight blank sailings announced in the week of 10 September, nine in the week of 17 September, fifteen in the week of 24 September.2 Meanwhile Asia–Europe softened as Suez transits recovered, adding effective capacity on that side.
This is worth understanding rather than just noting, because it is the mechanism by which your rate and your sailing get worse at the same time. Blank sailings are how carriers hold rates up in a soft market. They remove the ship and raise the price.
2. LCL or FCL: the break-even, and the fees that hide in LCL
The crossover sits around 13 to 15 cubic metres, with Canadian operators quoting 12 to 15. It is a genuine structural point rather than a rule of thumb: LCL cost scales with your volume, an FCL booking is fixed once made, and the two curves cross. Above the crossover you are paying per-cubic-metre prices for space that comes free inside a box you have already paid for.
The LCL fees that make cheap quotes misleading
An LCL ocean rate of US$40 per cubic metre is not what LCL costs. Typical 2026 ranges from forwarders — commercial figures, not tariffs — look like this:
| Line | Typical range | Note |
|---|---|---|
| All-in LCL ocean | US$40–$180 per CBM | The number you get quoted |
| Destination CFS handling | US$15–$40 per CBM | The one that is always left out of the comparison |
| Customs clearance and brokerage | US$100–$350 per shipment | Per shipment, not per CBM |
| Destination drayage and delivery | US$100–$500 per shipment | |
| Bunker adjustment factor | US$5–$40 per CBM | |
| Peak season surcharge | US$10–$25 per CBM | Clusters October to December |
Once those are stacked, a $40 per-cubic-metre ocean rate routinely lands at $120 to $160 per cubic metre delivered. Ask for the full cost scope including destination charges before you compare LCL to FCL, and ask for it in writing.
Two more LCL traps. First, the weight-or-measure rule: carriers charge whichever is greater, the volume in cubic metres or the weight in metric tonnes. Cargo denser than about 1,000 kg per cubic metre — tools, ceramics, anything metal — gets charged by weight, and a per-CBM estimate will be badly wrong. Second, time: LCL adds three to seven days at each end for consolidation and deconsolidation, so the shorter ocean leg often loses on door-to-door.
Container capacity, and the counterintuitive bit
| Container | Internal capacity | Maximum payload |
|---|---|---|
| 20ft standard | 33.2 m³ | 28,300 kg |
| 40ft standard | 67.7 m³ | 28,870 kg |
| 40ft high cube | 76.4 m³ | 28,690 kg |
Maersk's published figures; the carrier notes limits can vary by country.12 Now read the two columns against each other: a forty-foot container holds roughly twice the volume of a twenty-foot but carries almost exactly the same weight.
That single fact decides the box. For dense cargo you hit the weight limit long before the ceiling, and the 20ft is the right unit — a 40ft buys you nothing. For light bulky goods — which is most consumer tech and most home goods — the 40ft high cube is dramatically better value per cubic metre and should be the default.
3. When air freight is the rational choice
Air is not the panic option. It is the correct option for a specific and predictable set of shipments, and the test is arithmetic rather than temperament.
Chargeable weight, and the divisor you must check
Air freight charges the greater of actual gross weight and volumetric weight. The volumetric calculation is length × width × height in centimetres, divided by 6,000 — an industry standard set by IATA.13
Which means one cubic metre equals 166.7 kg chargeable. Anything lighter than about 167 kg per cubic metre pays on volume rather than weight, and most consumer electronics and home goods are well under that.
Check the divisor in your quote. Some carriers use 5,000 instead of 6,000, which makes a cubic metre 200 kg chargeable — a twenty per cent increase on bulky freight, buried in a number nobody reads.
What it costs, September 2026
| Mode | Indicative cost | Transit |
|---|---|---|
| Air cargo, 1,000 kg and over | US$7.47/kg | 3–4 days, airport to airport |
| Express courier (DHL, FedEx, UPS) | US$15.48/kg | 3–5 days, door to door |
| Sea LCL | US$190/CBM | 10–15 days port to port |
| Sea FCL 40ft | US$7,740–$9,460 | 16–25 days port to port |
Forwarder figures for China to Canada, September 2026 — indicative, not an index. A second forwarder quoted US$5 to $9 per kg for standard air on the same lane, which is consistent.
Note that express costs roughly twice air cargo per kilo but is door to door with customs included, while air cargo is airport to airport and still needs a broker and drayage. On a small shipment express frequently wins on total landed cost despite the higher headline.
The test
Freight as a percentage of goods value. At US$7.47 per kilo, a 20 kg carton of electronics worth $8,000 costs $149 to fly — 1.9 per cent of value. The same carton of ceramic mugs worth $300 costs half its value to fly. If freight comes in under about five per cent of goods value, air is defensible.
- Samples and pre-production approvals — always. A 25-day round trip on a sample kills a launch schedule.
- Opening stock for a launch, where an empty shelf costs more than the air premium
- Replenishing a stockout on a proven SKU
- Bridging Chinese New Year or Golden Week — air the critical SKUs, ocean the rest
- High value-to-weight goods generally — which is a large share of consumer tech
4. There is no rail from China to Canada
Worth one short section, because importers read about China–Europe rail and ask.
The Pacific has no rail crossing. Any "rail" line in a China-to-Canada quote is the inland North American leg: ocean to Vancouver or Prince Rupert, then CN or CPKC intermodal to Ontario. That is intermodal, not an alternative to sea.
China–Europe rail is a real third mode, and it is recovering strongly — China's State Council reported 5,460 train trips in the first quarter of 2026, up 29 per cent year on year, reaching 235 cities across 26 European countries. It is also geopolitically exposed: the northern corridor through Russia and Belarus collapsed after 2022, and the Trans-Caspian middle corridor that replaced part of it runs 50 to 60 day lead times. None of it is relevant to a shipment into Ontario.
Part two — the Canadian side
5. Which port, and why Prince Rupert keeps winning
For Chinese cargo destined for Ontario, the real choice is Vancouver or Prince Rupert. Montreal, Halifax and Saint John are primarily Europe and Mediterranean gateways; Asian cargo can route to Montreal via Suez but takes 30 to 37 days against 15 to 22 to the West Coast.
Sailing time from Asia — CN's own vessel transit table
| Destination | From Shanghai | From Hong Kong | From Busan |
|---|---|---|---|
| Prince Rupert | 232 h (9.7 days) | 264 h | 209 h |
| Vancouver | 255 h (10.6 days) | 289 h | 231 h |
| Seattle | 255 h | 288 h | 230 h |
| Los Angeles | 291 h (12.1 days) | 319 h | 262 h |
Hours at 20 knots cruising speed, from CN's published table.6 Prince Rupert beats Vancouver from Shanghai by about 23 hours and Los Angeles by about 59.
The Prince Rupert Port Authority's own claim is that it is the closest North American West Coast port to Asia, 500 nautical miles closer than competing ports, saving up to 60 hours of sailing time — with a direct single-line connection to CN's network and the flattest rail grade through the Rockies. Its published inland transit to Toronto is 4.5 days, against 6 from Seattle or Los Angeles. The main channel runs 35 metres deep against 16 at Seattle or LA.7
Volumes, 2025
| Port | 2025 containers | Change | Rail |
|---|---|---|---|
| Vancouver | 3.78 million TEU — a record | +9% | CN and CPKC |
| Prince Rupert | 885,797 TEU | +20% | CN only |
| Montreal | 1.52 million TEU | +3.6% | CN and CPKC |
| Halifax | 502,000 TEU | −1.4% | CN |
| Saint John | 239,364 TEU | +29.4% | CN, CPKC and CSX |
From the port authorities' own published results.8910 Note on the rail column: Canadian Pacific and Kansas City Southern merged in 2023 with Surface Transportation Board approval, creating CPKC — the first single-line railway connecting Canada, the United States and Mexico.11 If a forwarder still says "CP", they mean CPKC.
Saint John is growing fast — up 175 per cent since 2021, with a CAD $247 million West Side modernisation completed in January 2026 — but it has no direct Asia service, so it is not a realistic gateway for Chinese cargo today.
6. A worked landed cost to Southwestern Ontario
- The shipment
- 40ft high cube, ~65 m³, FOB Shanghai, goods value US$60,000
- The route
- Vancouver, CN rail to a Toronto ramp, drayage to Southwestern Ontario
- The rate environment
- September 2026 — high by historical standards
Illustrative, with the confidence level marked on every line. Assumes non-steel, non-aluminum consumer goods at a 6.5 per cent MFN duty rate and an exchange rate around USD 1.00 = CAD 1.37 — check both before you use this.
| Line | CAD | Confidence |
|---|---|---|
| FOB goods value | $82,200 | Your supplier's invoice |
| Ocean freight, 40HC Shanghai → Vancouver | ~$10,960 | Indexed, 24 Sep 2026 |
| Origin charges (export clearance, origin THC, docs) | $480–$890 | Typical range |
| Destination terminal handling | $410–$820 | Typical range |
| Customs brokerage — entry | ~$350 | Published broker tariff (1.75% of value, capped) |
| Brokerage — disbursement fee on duty and GST | ~$310 | Published broker tariff (3.5%) |
| Release prior to payment bond, first year | ~$300 | Published broker tariff |
| Duty at 6.5% of value for duty | $5,343 | CBSA method — note the value for duty excludes ocean freight |
| GST at 5% of duty-paid value | $4,377 — recoverable | CBSA published |
| Rail and terminal, Vancouver → Toronto ramp, plus GTA drayage | $4,800–$7,800 all-in | Canadian operator range |
| Extended drayage, Toronto → Southwestern Ontario | ~$700–$1,100 | Our estimate — get a real quote |
| Demurrage and detention | $0 if you are organised | See section 10 |
Rough total: CAD $111,000, or about $106,600 net of the recoverable GST. Freight and clearance come to roughly 24 per cent on top of the FOB price at September 2026 rates.
For perspective on what "rates are elevated" actually means to a budget: in the 2019 rate environment the ocean leg on that same container would have been around CAD $2,700 instead of $11,000, and the freight-and-clearance load would have been about 14 per cent rather than 24. That ten-point swing is the whole margin on a lot of consumer goods.
7. Three tax facts that change the budget
Fact one: you do not pay duty on ocean freight
Canada builds value for duty to the place of direct shipment. Transport and insurance costs to that place are added; costs from that place to Canada are deducted.17 On FOB Shanghai terms the place of direct shipment is the Chinese port, so the Pacific crossing is outside the dutiable value entirely.
On a container with $11,000 of ocean freight at a 6.5 per cent duty rate, that is roughly $715 of duty you do not owe. The trap is on CIF, DAP and DDP terms, where the invoice is often a single all-in figure — if the broker cannot separate the freight, it all goes into the value for duty. Require the invoice to itemise freight separately on any C- or D-term.
GST is then charged at 5 per cent on the duty-paid value — the value for duty plus the customs duty — rather than on the goods value alone.18 For a commercial import into Ontario, only the federal 5 per cent is collected at the border; the provincial portion is handled through your own GST/HST return, where a registrant generally recovers the import GST as an input tax credit. For a registered business, import GST is a cash-flow cost rather than a true one.
Fact two: the CUSMA thresholds do not apply to China
| Threshold | Amount | Applies to | Effect |
|---|---|---|---|
| General de minimis | CAD $20 | Any country, by mail | Duty and tax free |
| CUSMA courier — tax | CAD $40 | US and Mexico only | Duty and tax free |
| CUSMA courier — duty | CAD $150 | US and Mexico only | Duty free, taxes still apply |
| Courier Low Value Shipment Program | CAD $3,300 | Approved courier participants | Simplified accounting only — duty and GST still owed in full |
From CBSA's own published thresholds.1920 The $40 and $150 figures are a CUSMA concession for goods from the United States and Mexico. Any page claiming Canadians get $150 duty-free from China is wrong. From China, assume duty and GST from the first dollar — a $25 sample from Shenzhen is technically dutiable and taxable.
And the $3,300 figure is the most misread number in Canadian importing. It is a processing stream. Shipments under it, moved by an approved courier, get simplified and delayed accounting — faster release, consolidated payment. The tax is still owed. A container is far above it anyway and sits in the high value shipment stream, requiring a full commercial entry, your own business number with an RM import-export account, and CARM registration.
Fact three: check the steel and aluminum surtax against your HS codes
Canada applies a 25 per cent surtax on the value for duty of steel and aluminum goods produced in China, listed by tariff item, and it stacks on top of any other duties owing.21 A separate derivative-goods surtax order extends the same 25 per cent rate to specific finished goods with meaningful steel content — the published lists include items like furniture with metal frames, lighting fixtures and prefabricated building components, not just raw or semi-finished metal. Consumer tech and most home goods are still largely outside those schedules, but metal housewares, cookware, steel shelving, brackets, tool products, metal-framed furniture, lighting fixtures and aluminum-bodied goods may fall inside. Check the actual schedule against your classifications rather than assuming a chapter is clear. Surtax orders change several times a year.
The full picture on classification, duty rates and the other regimes that apply before goods can be sold is in our compliance guide for importing consumer electronics into Canada.
Part three — how long it takes
8. PO to shelf, week by week
| Phase | Duration | What to watch |
|---|---|---|
| Purchase order placed, deposit cleared | Week 0 | Most factories will not start until the 30% deposit lands |
| Production | Weeks 1–5 | 30 days typical; 45–60 for tooling or customisation |
| QC inspection and rework | Week 5–6 | Skipping this is the most common and most expensive first-timer error |
| Booking and space confirmation | 2–3 weeks before target sailing | Freight quotes typically hold only two to three weeks |
| Trucking to port, CY cutoff | Week 6–7 | Documentation cutoff is 2–3 days before the container yard cutoff, and VGM earlier still. Miss it by an hour and you roll |
| Ocean transit | 15–22 days port to port | About 10–11 days of that is pure sailing |
| Discharge and terminal processing | 1 day | |
| Customs clearance and rail loading | 1–2 days | File in advance — release can be pre-arrival |
| Rail to a Toronto ramp | 9–11 days from Vancouver; 7–9 from Prince Rupert | About 4,300 km |
| Drayage to Southwestern Ontario | 1–2 days | |
| Unload and receive | 1 day |
Realistic total: 11 to 14 weeks from purchase order to shelf. Add three to seven days at each end for LCL. And build in slack, because of what follows.
9. Chinese New Year 2027 is eleven days earlier
- CNY 2026
- 17 February. Official holiday roughly 15–23 February
- CNY 2027
- 6 February. Official holiday roughly 4–12 February
- Golden Week
- 1–7 October, both 2026 and 2027
Chinese New Year 2027 falls on 6 February, eleven days earlier than 2026's 17 February.23 That single fact will catch out a large number of importers who plan off last year's calendar, and it is the most actionable thing in this article.
The disruption is six to eight weeks, not one
- Pre-holiday slowdown: two to four weeks. From mid-January 2027. Migrant workers leave early, lines rush to clear orders, and quality degrades measurably. Factories become progressively unwilling to accept new orders as slots fill.
- The official holiday: seven to eight days on paper. In practice most factories are dark for two to three weeks.
- Ramp-up: two to four weeks. Through early to mid March 2027. Not all workers return. Output runs at partial capacity and defect rates spike.
What that means for your calendar
- Place sea-freight orders by November 2026. Air freight orders by late November or December.
- Final order confirmations by early December 2026.
- Book freight capacity in December, before the January general rate increase. Everyone ships at once in the three to four weeks before the holiday, and rates and rollover risk peak together.
- Treat anything produced in the two weeks before the break as higher risk and inspect it harder.
- Do not schedule a launch for March. March is ramp-up, and ramp-up is where defect rates live.
National Day Golden Week runs 1 to 7 October in both 2026 and 2027.23 It is shorter and less disruptive than Chinese New Year, but the carrier response is visible in the rate table in section 1 — fifteen blank sailings announced for the week of 24 September 2026 alone.
10. What actually goes wrong
The schedule reliability number you should plan to
In July 2026, global schedule reliability was 56.4 per cent — down 6.1 points month on month, 8.8 points year on year, and the lowest reading of 2026 — most other months that year ran in the high 50s to low 60s. The average delay for vessels that arrived late was 6.06 days, the highest recorded that year. No carrier recorded a month-on-month improvement. Maersk led at 73.7 per cent; the worst performer came in at 29.8.15
Read that as a planning input, not a complaint, and treat the specific figure as a bad month rather than a running average: even in a normal month, one sailing in three to four arrives late, and a bad month can push that closer to one in two, with an average delay of about six days when it happens. A schedule with no slack in it will miss.
Rolled cargo
Your container is at the terminal before the cutoff and does not get loaded. The main causes:
- Overbooking. Lines book to around 120% of vessel capacity expecting 10–20% no-shows. When everyone shows up, the excess rolls.
- Weight. The vessel hits its weight limit with slots still open. Heavy cargo rolls first.
- Documentation. Booking discrepancies, advance-data mismatches, or a declared weight off by more than about five per cent.
- Missed cutoff. Late gate-in by even an hour moves containers to a standby list.
- Blank sailing. The carrier skips the port and everything rolls.
A rolled container typically waits seven days for the next weekly service. The mitigations are unglamorous and effective: gate in 24 to 48 hours before cutoff rather than at it, declare weights accurately, and use a carrier with good reliability on shipments that matter.
Demurrage and detention — the line that eats the margin
Maersk's own definitions: demurrage is the time the filled container spends inside the terminal, measured from offloading until it is gated out; detention is the time it spends outside the terminal, from pickup until the empty is returned.14 Demurrage means you were slow to collect. Detention means you were slow to return.
Typical Canadian charges — commercial ranges, not tariffs — run $75 to $150 per container per day for the first few days of demurrage past free time, escalating to $300 to $500 and beyond after a week; detention runs $50 to $150 per day after a three to five day return window. Free time in Toronto is typically two to three business days, Montreal three to five.
Do the arithmetic once and you will never be late again: a container sitting ten days past free time can accumulate over $3,000 against a drayage move that cost $500. For an Ontario importer the exposure is structurally worse, because the free time is consumed by the rail journey before your warehouse has seen the box. Clear customs before arrival, book the drayage against the confirmed berthing date, and have staff and space to unload the day it lands.
GRI, PSS and the rate sawtooth
General rate increases are announced in advance — US regulation requires at least 30 days' notice — and typically land on the first of the month. Peak season surcharges behave the same way and cluster before Chinese New Year and the autumn holidays.24 The practical effect is that rates drift down through a month and then jump on the first. A quote's expiry date matters as much as its number.
The checklist
Before you book
- Pull the current rate from Drewry or Freightos yourself — do not budget from an article
- Calculate your volume and check it against the 13–15 CBM break-even
- If FCL, pick the box by density: 20ft for heavy, 40HC for bulky
- Confirm the air divisor in any air quote — 6,000 or 5,000
- Get the full cost scope including destination charges, in writing
- Confirm the quote's expiry date
Before the goods ship
- CARM registration, business number and RM import-export account in place
- Your own financial security posted for release prior to payment
- Broker appointed with signed written authority and portal access
- Classification confirmed line by line; steel and aluminum surtax schedules checked
- Commercial invoice itemises freight separately if you are on a C- or D-term
- Marine cargo insurance in your own name, covering the inland leg
Before the vessel arrives
- Entry filed for pre-arrival release
- Drayage booked against the confirmed berthing date
- Free time confirmed in writing for both demurrage and detention
- Dock space and staff scheduled for the day of delivery
On the calendar now
- Golden Week: 1–7 October 2026 and 2027
- Chinese New Year 2027: 6 February — order by November 2026
- Book freight capacity in December 2026, before the January increase
- Do not schedule a product launch for March 2027
If you are a factory or brand
Put your line in front of Canadian buyers
Tell us what you make and we will tell you, within two business days, what it would take to bring the line into Canada — including whether the certification you already hold is usable here.
Submit a lineIf you are a Canadian buyer
Buy from someone who has already done it
We confirm Canadian certification and labelling before you commit to an order, and our invoices carry the documentation a marketplace audit asks for.
Open a wholesale accountCommon questions
How much does it cost to ship a container from China to Canada?
On 24 September 2026, Drewry's World Container Index put Shanghai to Los Angeles at US$7,838 per forty-foot container, and the Freightos index put China to the North American West Coast at US$8,102 — two independent indices agreeing within about three per cent. Vancouver and Prince Rupert price in the same band. Add roughly CAD $4,800–$7,800 to get a forty-foot box from a West Coast port to a Toronto door by rail and drayage, and another $700 to $1,100 to reach Southwestern Ontario. But treat every one of those numbers as a snapshot: the same index composite was $2,712 four months earlier.
Is LCL or FCL cheaper?
Below roughly 13 to 15 cubic metres, LCL. Above it, a full container. LCL cost scales with your volume while a container is a fixed price once booked, so the two curves cross. Two things distort the comparison. First, cheap LCL quotes routinely exclude destination charges — CFS handling, deconsolidation, brokerage and delivery — which can double the effective per-cubic-metre cost. Second, LCL adds three to seven days at each end for consolidation and deconsolidation, so a shorter ocean leg is often a longer door-to-door.
How long does shipping from China to Canada take?
Pure sailing time from Shanghai is about 9.7 days to Prince Rupert and 10.6 days to Vancouver, per CN's own vessel transit table. Port to port with transshipment and port calls, budget 15 to 22 days. Then one day to discharge, one to two for customs and rail loading, seven to eleven days on rail to a Toronto ramp, and one to two days of drayage. Door to door from China to Ontario is realistically four to six weeks, and eleven to fourteen weeks from placing the purchase order.
Do I pay duty on the ocean freight?
No. Canada builds value for duty to the place of direct shipment: costs to that place are added and costs from it are deducted. On FOB Shanghai terms the place of direct shipment is the Chinese port, so the Pacific crossing sits outside the dutiable value. The catch is on CIF, DAP and DDP terms, where the invoice is often one all-in number — if your broker cannot identify the freight, the whole amount goes into the value for duty. Insist the invoice itemises it.
Does Canada have a $150 duty-free threshold from China?
No, and this is the most commonly repeated error about Canadian importing. The $40 tax-free and $150 duty-free courier thresholds are a CUSMA concession and apply only to shipments from the United States and Mexico. From China you get the general $20 de minimis for mail and nothing more. For commercial goods from China, assume duty and GST apply from the first dollar.
What is the Courier Low Value Shipment threshold?
CAD $3,300 — and it is a customs processing stream, not a tax exemption. Qualifying shipments moved by an approved courier participant get simplified accounting and delayed accounting, which means faster release and consolidated payment. Duty and GST are still owed in full. This is the single most misread number in Canadian importing. Anything above $3,300 is a high value shipment requiring a full commercial entry, your own business number with an RM import-export account, and CARM registration.
When is Chinese New Year 2027 and how should I plan around it?
Chinese New Year 2027 falls on 6 February, with the official holiday running roughly 4 to 12 February. That is eleven days earlier than 2026's 17 February. The official holiday is a week; the disruption is six to eight. Factories slow for two to four weeks beforehand as migrant workers leave early, close for two to three weeks in practice, and take two to four weeks to return to full output and normal defect rates. Place sea-freight orders by November 2026 and book freight capacity in December, before the January rate spike.
What is the difference between demurrage and detention?
Demurrage is charged while the container sits inside the terminal, from discharge until you gate it out. Detention is charged while the container is outside the terminal, from pickup until you return the empty. Demurrage means you were slow to collect; detention means you were slow to return. For an Ontario importer the free time is largely consumed by the rail journey inland before your warehouse has seen the box, so clear customs before arrival and book the drayage before the vessel berths.
Sources
Every figure and rule above comes from one of these. Where this article draws a conclusion the source does not state literally, it says so in the text.
- Drewry — World Container Index
- Daily Cargo News — World Container Index, 24 September 2026
- Daily Cargo News — World Container Index, 17 September 2026
- Freightos — Freightos Baltic Index, China/East Asia to North America West Coast (FBX01)
- Freightos — Freightos Baltic Index, China/East Asia to North America East Coast (FBX03)
- CN — Prince Rupert transit time advantage (vessel transit table)
- Prince Rupert Port Authority — our advantages
- Prince Rupert Port Authority — 2025 cargo volumes
- Vancouver Fraser Port Authority — record cargo in 2025
- Port of Montreal — containerized cargo statistics
- Surface Transportation Board — approval of the Canadian Pacific / Kansas City Southern merger (CPKC)
- Maersk — container cargo weight limits and capacities
- Maersk — air cargo chargeable weight and the IATA volumetric divisor
- Maersk — what are demurrage and detention
- Sea-Intelligence — July 2026 global schedule reliability falls to the lowest level of 2026
- Drewry — cancelled sailings tracker
- CBSA — Customs Valuation Handbook
- CBSA — guide to importing commercial goods, step 3: duties and taxes
- CBSA — increase to low value shipment thresholds under CUSMA
- CBSA — Memorandum D17-4-0: Courier Low Value Shipment Program
- CBSA — Customs Notice 24-36: China Surtax Order (2024) on steel and aluminum
- CBSA — Memorandum D3-5-1: marine pre-load and pre-arrival reporting
- TravelChinaGuide — Chinese public holidays 2026 and 2027
- Flexport — GRI and PSS freight fees
Last reviewed September 25, 2026. Rules and rates change. If you find something here that has gone out of date, tell us and we will fix it.